Foundation Work
Footing as/ structure drawing
Water Tank
PCC With Concrete Mix Of 1:4:8 in footing
Foundation Depth 5′ or As/Structure Designing
Plinth Level+2′-6″ From Road
Porch Level +1′-6″ From Road
Civil Structure Work
Branded Bricks of 1st Class in C.M 1.6
Good Quality Cement Of Brand Duraton 5X
Sand for Brick Work/ Plaster Work-Washed Cours Sand
Course Aggregate (Gravel Completely Washed)
RCC Slab In 1.1 1/2 .4 Cement Concrete Mix M 25
Slab Clear Height 11′-0″ From Floor (Only Ground )
Anti- Termite Treatment Of 3 Levels
Stairs Will be of R.C.C , Steel
Coloumns and tie beams As/ Structure –
Steel Design as/Drawing ( Avrg.Steel 2.5-3 Kg)
Steel Brand JSW
Water Proofing – Dr. Fixit
Water and Electricity by Owner (Connection and Bill)
Parapet Wall 3.5 ft. height.
Flooring
Base of lean Concrete 11/2″ Thick With Concrete mix with brick Ballast base
Terrace covered in Roof Tiles with mud phuska
TOILETS /KITCHEN
CPVC Pipe Fittings (ashirwad/finolex)
GAS Pipe Fittings
SOLAR Electric Fitting
Water Level Indicator at Each Level
Body of Diverters (Jaquar)
Overhead Storage Tank (2000 Ltr.) 3 Layers
Electricals
Conduting & modular boxes (Polypac)
Video Door Phone Wire Provision
Gate Lock Wire Provisionfor Intercom
Finishing Work
Wall Plaster 1:5 Cement Morter in Sute and Sohal
Malaysian sal Wood chaukhats
Framing at Cutout (Jaal)
Elevation as / 3D design